|
| |
|
Production :
Injection Moulding
Pin Insertion
Tape Slitting |
 |
Production Facilities :
5
THERMO SETTING INJECTION MOLDING m/c 70 ton
2
THERMO SETTING INJECTION MOLDING m/c. ( 50 tons)
8
PIN INSERTIN m/c FOR BOBIN
2
PIN INSERTION m/c FOR PLASTIC PART
2
SLITTING m/c for TAPE CUTTING PROCESS
Supporting Production Facilities :
Cooling Tower
system for Injection and Slitting m/c
2 Screw type
air compressor
2 Deflashing
m/c
Crane machine
system for Injection
200 KVA Electric
power
Quality
Quality System
PT.KDI already implement ISO 9001-2000 since June 2000 got the ISO
certification from SGS Indonesia.
Follow the ISO Standard , we do the internal quality audit to ensure
the quality system was done for all related dept.
Quality Facility
Since the objective of internal quality inspection on area of dimention
and pin strength, quality control have facilities as below ;
Caliper
Micrometer
Push pull gauge
Internal Rejection Ratio
In-process rejection target is 0.5%
Outgoing rejection target is 0.5%
Quality Achievement from Customer
Based on no design capability,PT.KDI maintain the quality following
the customer requirement.
To achieve customer requirement , internally We do the continous
improvement on the production process to minimize handling or rejection.
Delivery
Delivery System
Delivery based on schedule or po due date
if we have avaiable stock
Arrange documents one day before delivery
Any changeous inform 2-3 days before delivery
back to top
|